ENOC > Media Centre > News Releases > Press release detail
News Releases

News Releases

ENOC Group opens a new service station at Wadi Al Amardi in Dubai

October 07, 2020

ENOC Group recently opened a new service station at Wadi Al Amardi in Dubai to serve the fuelling needs of nearby communities; including Mirdif, Al Khawaneej and Al Warqa’a; bringing the total number to 145 service stations in the UAE.

The service station is equipped with a complete retail automation system and is built with five tandem bridge canopies. The station’s infrastructure is equipped with six underground fuel tanks at a capacity of 12,000 imperial gallons and 10 fuel pumps. In addition, the station includes a 1,400 sqft ZOOM C-store, Pronto and other F&B options.

His Excellency Saif Humaid Al Falasi, Group CEO, ENOC Group, said: “There are several projects which have been built to serve residents living in Mirdif and Al Khawaneej; in addition to the roads infrastructure development works underway for the Khawaneej Roads Improvement project – all of which anticipate an increased traffic flow in and out of these neighbourhoods. We recognise this as an opportunity to further expand our presence across the UAE to offer our customers access to fuel, while fulfilling the daily needs of these communities.”

The station is built in compliance with new UAE Facility Management Green Build Regulations with full CCTV surveillance and automatic number plate detection cameras to ensure the highest security.

Safety features include UL-certified double wall tanks, double wall fuel piping with secondary containment to safeguard any environmental contamination. It also has a fully automated fuel system with Auto Tank Gauging and Electronic Leak detection system. The station is also powered with stage one vapour recovery system to capture displaced vapours emerging from a storage tank when gasoline is delivered into the tank and stage two vapour recovery system to capture displaced vapours emerging from inside a motorist’s fuel tank, when gasoline is dispensed into the tank. This advanced mechanism avoids hazardous emissions to the atmosphere and enhances the nearby air quality.

To further enhance the energy efficiency measures at the service station and reduce its carbon footprint, optimised lighting and illumination design has been made installed with zero maintenance, low-voltage LED lights with a life span of approximately 50,000 hours to reduce the energy consumption by 50 percent.

The station accepts multiple payment methods including ENOCPay, ViP, Nol, and Dubai Now.


Get In Touch

Please let us know if you have any feedback, request for information or any questions about ENOC.

Get In Touch

Please let us know if you have any feedback, request for information or any questions about ENOC.